General Description
Equipped using the zero leak bidirectional checking sole-noid valves, this power unit is created for the operation of two independent circuits. Which are respectively for that main and subordinate platforms with the double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in case of power loss. If much more independent circuits are expected to your application please get hold of us for availability.
Remark: one. Please consult our sales engineer to the different pump displacement, motor power or tank capability.
two. CSA or UL certified motors are available upon request.
Distinctive Notes
1. The AC motor is of S3 duty cycle, which could only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic components concerned before installation of the energy unit.
3. Viscosity in the oil shoud be 15~46 cst,and also the oil need to be clean and cost-free of impurities,N46 hydraulic oil is proposed.
4. The electrical power unit really should be mounted vertically.
five. Check the oil degree within the tank right after the original operating with the power unit.
6. Oil shifting is needed right after the original a hundred operation hours,afterwards the moment each and every 3000 hrs.