we source chromed bar and tubes for hydualic and pheumatic cylinders. we are self-assured to provide our clients flexible and diversified companies. Advanced thermo therapy gear, such as network heat therapy oven, multi-use thermo treatment method oven, and so on. Products DESCRIPTION
QC EPTs EPT JIC to EPT EPT adapter/stainless steel straigEPTT fittings/EPT male fitting are well-known in North America and Europe.
We only concentrate on SS304, SS316L and SS316Ti. All our CNC lathe EPTTs and inspection equipment are high-precision, it can handle accurate thread and dimensions.
EPT fitting application Maritime, military Protection JCEP, EPTs ampEPT, Oil and gas market, EPT faXiHu (West EPT) Dis.Hu (West EPT) Dis.ty and technique, EPT EPT, Foods Procession.
Element No. | T1 (UNF/UN-2A) |
T2 (NPTF) |
L | H(INCH) |
2404-02-02 | 5/sixteen-24 | one/8-27 | 28.20 | 7/16 |
2404-03-02 | 3/8-24 | 1/eight-27 | 29.00 | 7/16 |
2404-04-04 | 7/16-twenty | one/four-18 | 36.10 | 5/eight |
2404-05-04 | 1/two-20 | one/four-eighteen | 36.10 | five/8 |
2404-06-06 | nine/16-18 | three/eight-18 | 36.thirty | 13/16 |
2404-08-08 | 3/four-16 | one/two-fourteen | 45.fifty | fifteen/sixteen |
2404-ten-08 | 7/eight-14 | 1/two-fourteen | 48.00 | 15/16 |
2404-twelve-twelve | one 1/sixteen-twelve | three/4-fourteen | 52.thirty | one-one/8 |
2404-14-12 | one three/16-12 | 3/4-fourteen | fifty three.10 | one-one/4 |
2404-16-16 | 1 five/sixteen-12 | one-11 one/two | 58.forty | 1-3/8 |
2404-20-20 | one 5/eight-twelve | 1 1/four-eleven one/two | sixty two.20 | 1-eleven/sixteen |
2404-24-24 | one 7/eight-twelve | one 1/two-eleven 1/2 | 68.10 | 2 |
2404-32-32 | two one/2-12 | 2-11 1/two | seventy nine.00 | two-five/8 |
EPTHNICAL Assistance
We do have the abilitly to layout CAD drawings/prints for acceptance when confirming the orEPTTbefore mass manufacturing.
Relevant Merchandise
Items Procedure
OUR Certification
EXHIBITION
EPTT amp Shipping and delivery Method
Business PROFILE
QC EPTs was found in 1999, with twenty a long time machining knowledge, areas are made meeting ISO 9001 top quality stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds and conform to SAE, BS, ISO and DIN norms. Our main focus are stainless metal EPT fittings amp stainless steel braided PTFE hose assembly. At present we are the provider for numerous of well-known distributors, EPTTsalers and OEM companies in North America and Europe. All they are very well-known manufacturer makers and distributors in their neighborhood industry.
QC EPTs aims to assist clientele for cost savings. EPT be concerned, conserving time and preserving cash. Our aim is to be the NO.1 provider of stainless steel EPT fittings and adapters in 10 years in EPTT.
HOW WE Control Quality
1. 1st Report Inspection During Process
1).The operator make the very first post in accordance to manufacturing drawings.
two). The operator will examine the 1st post and document. If the sizes and threads meet the producing drawings, and then the initial post will be place in a EPTT box( the box is for very first article only).
3). Workshop foreman will take next inspection for the initial write-up.
four). Only passing the inspection by workshop foreman, and then begin with mass generation.
two. Mass Manufacturing Right after Very first Article Inspection
1).Following the first post accepted by operator and workshop foreman, and then start off with mass manufacturing.
two). Throughout mass manufacturing, the operator requirements to inspect the threads each ten parts, and evaluate the sizes each and every fifteen items. After any fittings of threads and dimensions out of the specs, all this batch of fittings will be inspected completely.
3). The qualified fittings will be fitly set in a plastic box piece by piece.
4). Ultimately, the finished fittings will be transported to inspection section for closing inspection.
three. Last Inspection
one). Look one hundred% inspection unEPTTstrong light-weight. No scratch, No burr.
2). Important dimensions and angles fifteen-twenty% randomly inspection by callipers and contracer. After any sizes and angles of fittings out of specs or doesn’t regard to drawings, this batch of fittings will be pressured to return again to generation workshop to increase or make a new alternative.
3).Threads 15-20% randomly inspection by rigEPTT gages. As soon as any threads out of specs or doesn’t regard to drawings, this batch of fittings will be pressured to return again to generation workshop to increase or make a new replacement.
FAQ
Q: Are you buying and selling business or manufacturer ?
A: We are 100% manufacturer.
Q: How EPTT is your delivery time?
A: About forty five daEPTTfor common orders. But it is dependent on the orEPTTvolume/amount. Of system, if you have an urgent purchase, we will attempt best to meet up with you.
Q: Do you provide samples ? Is it free of charge or extra ?
A: Sample is free, we have the spending budget every single yr.
Q: What is your terms of payment ?
A: Normally thirty% deposit, equilibrium just before shipment or from BOL copy. Payment is Negotiable.
Q: Do you offer OEM services and can you produce as our drawings or samples?
A: Yes. We supply OEM service. Our most fittings exact same as Parker and EPT designs, and meet up with SAE, DIN, ISO,BS specification. We also make huge quantity fittings according to our clients drawings and exact samples.
Q:What is the application for your fittings?
one – Oil and gas market
2 – Extraction program
three – Petro and chemical industry
four – EPT faXiHu (West EPT) Dis.Hu (West EPT) Dis.ty and program
5 – JCEP and liquid system
six – Maritime, Military Protection JCEP
7 – EPTT building
8 – EPT industry
nine – EPT EPT
10 – EPTs amp EPT
11 – Food Processing Lastly, we do enjoy you attention to our company and our merchandise: stainless steel EPT hose fitting and adapters