Overview Quick Details
Supply Ability
Packaging & Delivery
Online Customization
Product Description
Quotation of Open Mill XK-250X620ZG-B
(direct conncet-7.1)
Date: July 5, 2019 Validity: two months
Technology parameter
Mill (XK-250ZG-B)
Pressure and frequency of electricity
380V, 50Hz
Diameter of roll
Ø 250mm
Width of roll
620mm
Rolls heating method – hot water temperature controller / heating power
Rolls cooling method
Hot water up to 95℃
18KW / 20KW
Natural water
Linear speed of forward roll
15.39m/min
Friction ratio of two rolls
1:1.25
Hardness of a surface rolls , not less
HS: 68-73
Bearing of roll
Roll bearing with four rows column + deep groove ball bearing
Flywheels (Adjust distance between roll)
Electric + manual
Distance between two rolls (Working)
8mm
Feeding quantity once
10 -15 Kg
Reducer No
ZSY280-40
Speed rate
1:40
Motor model
Y 200L 1-6
Rotate speed of motor
980 r/min
Power of motor
18.5KW
Restrictive plate
Fixed restrictive plate from two planting parts.
Emergency switches
It located in front and behind mill, and also from above. At emergency switching-off – a way of braking rolls no more than 0,25 revolutions roll (90 °) with simultaneous tap(removal) forward roll on distance not less than 25 mm.
Coupling connecting motor and rolls
Cross slide coupling
overall size (L×W×H)
2726mm× 1860mm× 1550mm
Weight
4.5Tn.
Mill 250 To Russia
Open mill XK250ZG-B to Russia.
Plastic film wrap
Our Services
Engineers available to service machinery overseas.
24-Hours online service.
On demand customization.
Strong technical support and after-sale service.
Guarantee period: 1~3 years
Company Information
FAQ
1. What is the capacity?
2. What is the type and dimension of raw material (steel cored tire, fiber cored tire, shoe sole, rubber sheet, rubber plate, rubber tape, rubber tube or something else)?
3. What is the dimension of final material?
4. What is the type of rubber (TPU, EPDM, SBR, NBR, EPR or something else )?
5. What is the type of plastic (PP,PE, PVC, ABS, HDPE, PC, PET or something else)?
6. What is the technological requirements?
7. What is the requirement of delivery time?
8. What is the requirement of shipping?
9. What is the requirement of packing?